×

Recent Comments

    Categories

    FORGOT YOUR DETAILS?

    North Owens Station

    by / / Projects

    pulling-cables Pulling 5kV cables to two 1750HP mainline pumps

    station-construction Incoming service 24:5 volts, stepped down to 4160 and 480 volts for power

    pump-skids Two 1750HP pump skids with motor operated valves and instrumentation

    TESSCO Provides Station Construction

    TESSCO Industrial provided construction services for the North Owens Station which was designed to store and transport crude oil near Big Lake, Texas.

    The North Owens Station included all new equipment, pumps, meter skids, transformers, 82,000 barrel tank and a MCC building.

    TOP