×

Recent Comments

    Categories

    FORGOT YOUR DETAILS?

    Driver Station, Texas Upgrade

    by / / Projects

    TESSCO Provides Station Construction & Expansion

    Driver Station is part of the Plains All American Pipeline located in Texas.

    TESSCO Industrial was tasked with the construction and expansion of this crude oil station. The expansion included, two 350 HP booster pumps, three 1750 HP mainline pumps, meter prover skids, delivery act skids, transformers and a MCC building. In addition, a new 80,000 oil storage barrel tank was constructed.

    electrical-conduit Installation of underground electrical conduit and ground grid at pipeline launching area

    mainline-pumps Three 1750 HP mainline pumps

    field-wiring Terminating home run cables and field wiring on junction boxes and starter panels

    medium-voltage-transformer Four medium voltage transformer for mainline pumps and transformer for MCC power

    motor-control New motor control center building for tank storage facility

    medium-voltage-disconnects Four medium voltage disconnects on all incoming power to new MCC building

    TOP